In any HVAC system,selection of chillers involve
many factors to be considered judiciously.These factors simultaneously present many
advantages and disadvantages to end users.For the selection of water chillers,HVAC
engineers consider all these factors keeping in view all the resources they
have at their facility.
![]() |
Absorption chiller vs electric chiller |
Comparison of Absorption Chillers and Electric (Compression) Chillers
Following is the comparison of absorption chiller and
electric chiller is presented below with aim to help you to decide the type of chillers for HVAC system.
- Absorption chillers have COP (coefficient of performance )of only 0.54–1.1 and it competes poorly with electric chillers (rotary compressor chillers). Electric chillers on other hand have COP from 1.0 ~ 8.0.
- Absorption HVAC chillers occupy approximately 50% more floor area than the equivalent electric chillers (vapor compression chillers).
- Additionally due to height of absorption chillers, mechanical equipment rooms must be 6–10 ft taller than rooms housing electric chillers. Finally, because the liquid solution is contained in long, shallow trays within an absorption chiller, the floor must be as close to absolutely level as possible.
- In HVAC system,Absorption chiller will weight at least twice as much the equivalent electric chiller (vapor compression chiller).
- Due to greater size, absorption chillers are sometimes shipped in several sections, requiring field welding for final assembly.This is not case with counterpart electric chillers or compression chillers.
- Most of electric water chillers are shipped from the factory with their refrigerant charge installed.While the refrigerant and absorbent (including additives) must be field installed in absorption HVAC chillers.
- When we talk about noise and vibration, absorption chillers (unless direct-fired) are quiet and essentially vibration-free as compared to compression chillers (electric drive chillers). Noise and vibrations in HVAC system annoy more than anything else .
- Due to the potential for crystallization of the lithium bromide in the chiller if it becomes too cool, the condenser water temperature must be kept above 75–808F.There is no problem of crystallization in electric chillers (vapor compression chillers). Forget about the crystallization and stay cooled if you have installed compression chillers .
- Absorption water chillers require sometimes an emergency power source if lengthy power outages are more often expected. Without power and heat input, the chiller begins to cool and the lithium bromide solution may crystallize. However, as absorption chillers consume very little electric energy so a small dedicated back-up generator can serve this purpose well.
- HVAC system also gives importance to the amount of heat to be rejected in condenser by water cooling or air-cooling media.The heat rejection rate from the condenser of lithium bromide chiller is 20–50% greater than for the equivalent electric chiller, requiring higher condenser water flow rates and larger cooling towers and condenser water pumps.
- Finally, an indirect-fired absorption water chiller will be at least 50% more expensive to purchase than the equivalent electric-drive chiller. Direct-fired absorption chillers will cost almost twice as much as an electric machine, and have the added costs associated with providing combustion air and venting (stack).
- Absorption water chiller or lithium bromide chiller uses natural refrigerants such water and eliminate the need of CFC or HCFC refrigerants which have high global warming potential.
- If you have plenty of waste heat or direct fire available ,and want to reduce your electric load ,then probably absorption chillers are the best solution.But obviously all above factors are to be considered for the selection of HVAC water chillers.

stevedune 1p · 643 weeks ago
Cecilia · 643 weeks ago
joe · 637 weeks ago
Claire · 634 weeks ago
John Wood · 630 weeks ago
kelvinsystems 1p · 629 weeks ago
Huber · 615 weeks ago
allanmurray · 608 weeks ago
ac Install heath
Francesca · 606 weeks ago
realname · 603 weeks ago
Simon · 603 weeks ago
sharifah · 589 weeks ago
Tom · 576 weeks ago
Heating Repair Services
My recent post Heating Repair Services updated Fri Apr 11 2014 4:02 am EDT
Steven Cohen, PE · 573 weeks ago
Steven Cohen, PE · 573 weeks ago
caicai12 11p · 572 weeks ago
Randy
randydavis387 at gmail.com
HVAC Repairs Firm · 572 weeks ago
Steven Cohen, PE · 572 weeks ago
David R. Pospisil, CEM
Manager, Commercial & Industrial Energy Efficiency Programs
Con Edison Company of New York
4 Irving Place, Floor 10NW
New York, NY 10003
Office (212) 460-2429
Email pospisild@coned.com
Twitter @dpospisil
Heating Service NJ · 570 weeks ago
MikeLintro 30p · 548 weeks ago
MUKESH · 524 weeks ago
My recent post Click one of the post titles above to include it at the end of your comment
hassan · 495 weeks ago
Chin · 486 weeks ago
naresh · 482 weeks ago
keep it up...
KK Nag · 473 weeks ago
Evaporative Cooling